• 葆慷美






  • Food industry

    Food industry

    Equipment production, installation, and mixing system installation The production and installation of stainless steel platforms in the fermentation workshop, ingredient workshop, and refining room Pipeline installation engineering (steam pipelines, process pipelines, circulating water pipes...
    Chemical industry

    Chemical industry

    Operate steel platform production, rust removal and painting Installation of process equipment, production, installation, rust removal and painting of steam pipelines and supporting brackets Insulation and cooling of equipment (reactors, condensers, etc.) and pipelines (steam, cold water pipes, etc.)
    Pharmaceutical industry

    Pharmaceutical industry

    Installation of equipment and electric hoist Production and installation of carbon steel platforms in the synthesis area, crude refining room, and stainless steel platforms in the refining room Pipeline installation engineering (steam pipeline, hot water pipeline, process water supply pipeline...
    Steel industry

    Steel industry

    Parameters of waste heat boiler (single set): Annual operation time: 300 days/year Inlet flue gas temperature of waste heat boiler: 200~800 ℃ Waste heat boiler flue gas flow rate: 165000~210000 Nm3/h) Rated steam production pressure of waste heat boiler (displayed on the gauge): ≤ 2.0 Mpa...
    Painting industry

    Painting industry

    Design, production, and installation of exhaust gas treatment equipment Selection, installation, and commissioning of zeolite wheels Production and installation of exhaust gas treatment equipment platform and pipelines Installation and commissioning of electronic system instruments and control systems...
    7 record 1/1 page