• 葆慷美






  • Beihai Chengde Nickel Industry Co., Ltd. Waste heat power generation

    Project overview:
    Place: Tieshan Port Area, Beihai, Guangxi
    Introduce: (6 items) Manufacturing of waste heat recovery equipment, process pipelines, and automation installation engineering for the 70 ton A0D furnace production line.

    Construction content:
    Design, production, and installation of waste heat boilers
    Smoke system, ash removal, ash conveying system
    Manufacturing and installation of steel platform for boiler system
    Pipeline installation engineering (pipelines within the scope of drawings such as steam pipelines, hot water pipelines, circulating water pipelines, compressed air pipelines, etc.)
    Electrical system instrumentation and control system

    Parameters of waste heat boiler (single set):
    Annual operation time: 330 days/year
    Inlet flue gas temperature of waste heat boiler: 630 ℃ (maximum 900 ℃)
    Waste heat boiler flue gas flow rate: 110000 Nm3/h
    Rated steam production pressure of waste heat boiler (displayed on the gauge): ≤ 2.4 Mpa/0.3 Mpa
    Saturated steam pressure at the outlet of the heat storage device (displayed on the gauge): 1.6 Mpa
    Saturated steam flow rate at the outlet of the heat storage device (displayed on the meter): 13 t/h (continuous)
    Saturated steam temperature at the outlet of the heat storage device (displayed on the table):~204 ℃

    Benefit analysis (single set):
    Economic benefits (calculated based on steam production):
    Annual steam production: 102960 tons/year
    Annual income: 102960 × 155=15.9588 million yuan/year.
    Environmental benefits:
    Through heat recovery, a single set of waste heat boiler can save 10000 tons of standard coal per year, which can reduce CO2 emissions by 33800 tons, SO2 emissions by 300 tons, smoke and dust by 146 tons, ash and slag by 1174 tons, etc.

    Site overview: